The enquiry-to-report process
- 1. Receive an enquiry and assign an owner.
- 2. Complete the brief and confirm scope.
- 3. Prepare and approve the proposal.
- 4. Plan tasks and required inputs.
- 5. Record delivery and deviations.
- 6. Check supporting records and close the project.
- 7. Build a report from the recorded items.
Roles and access boundaries
- Coordinator: owns scope, deadlines and work allocation. Access: projects they coordinate.
- Delivery team member: owns assigned tasks and records outcomes. Access: necessary working data, excluding internal financial views.
- Manager: approves deviations and evaluates the project. Access: summaries and permitted detail.
Data needed for the first phase
- A unique project identifier.
- Agreed scope and subsequent changes.
- Responsible people and deadlines.
- Task status and delivery records.
- Planned and actual items, where included in the brief.
Connections and open questions
A connection to an existing system is designed after verifying its interface, permissions, source of truth and responsibility for errors. This example promises no integration with a particular brand.
Before estimating, decide who confirms scope, how an absent approver is covered and what happens to incomplete records. Unknown inputs remain open questions with assigned owners.
What belongs in the first phase
This example starts with a project register, tasks, responsibilities and one verifiable report. Automated connections follow interface verification. Advanced planning and additional reports are assessed separately; they are not automatically included in the first phase.
How to accept the result
- A report can be traced to its project and source item.
- A missing value is distinguishable from a confirmed zero.
- Users only see data appropriate to their task and permissions.
- A scope change has an owner and a recorded reason.
- The output can be checked on an agreed synthetic project.
How to assess the benefit
Before the change, measure preparation of a typical report and availability of required inputs. After introduction, compare the same report type at a similar scope. Specific targets are agreed once baseline data is available.
Also record missing inputs and manual corrections. A faster report is useful only if its data can be checked. This example contains no return-on-investment calculation or promised saving.