Separate a tool limitation from a process problem
Describe one recurring problem: someone overwrites newer data, a report needs manual consolidation, or nobody knows who may change a project status. For each example, identify the person responsible, the inputs they need and how they know the work is complete.
A spreadsheet may remain a good choice for a one-off analysis or a register with a clear owner. If a shared template, naming rule and assigned responsibility solve the problem, test that smaller change first.
Look at the boundaries of shared work
Repeated version conflicts, copying the same data, approvals outside the record and different access requirements can justify a change. Collect actual situations: saying that spreadsheets slow everyone down is not enough to define a solution.
Use a synthetic project to trace a summary figure back to its source item. Can you identify its origin, status and owner? An unknown value should be distinguishable from a confirmed zero.
Define a small, testable scope
Choose one flow, such as recording a cost and including it in a monthly report. Define mandatory fields, roles, exceptions and the output. Keep existing calculations as a comparison where their rules are understood and correct.
One acceptance example: an authorised person updates an item, the summary changes correctly and a reviewer can trace the old and new values. Also try a missing input and a person without permission.
Compare like with like
Before the pilot, record the time needed for a representative report, manual corrections and missing inputs. Repeat the same task after the pilot with a comparable scope. Agree who evaluates it and what would justify continuing.
Our case study demonstrates the value of connected project data. It does not claim that a particular client replaced Excel. Your own process and a verifiable need should determine the next step.