First phase: one recurring report
Choose one question, such as the difference between project plan and actuals. Prepare an anonymised input export and a manually verified result for the same period. Agree approved statuses, units and handling of missing data. A blank cell does not always mean zero.
At acceptance, the total must match the included items and an incomplete record must remain visible. Our case-study video and text example illustrate this rule. They use fictional data only and do not prove a particular customer saving.
Start with a question and decision
Identify what a manager or team needs to know: where a project differs from its plan, which inputs are missing or what requires approval. Connect each question to a decision and the person making it. A report without a use can become just another output.
Agree the period, perspective and level of detail. A monthly summary and a daily list of outstanding items serve different situations. They may need different filters and refresh schedules.
Give each value a clear meaning
For every field, define its source, owner, unit and effective date. Separate plan from actual values and missing inputs from confirmed zeros. Where currencies differ, make the conversion rule and date explicit.
Identical column names do not guarantee identical meaning. For example, the date a document was created and the date work happened may fall in different periods. Agree which date the report uses before adding values together.
Make summaries traceable to items
Users need to verify how a result was produced within their access rights. Filters should make the included period, project and status clear. An export should preserve the meaning of the values shown on screen.
An acceptance example: the permitted source items add up to the summary under the same filters. After an item is corrected, the result updates under the agreed rule and records missing mandatory inputs remain identifiable.
Measure usefulness in everyday work
For a comparable report, track preparation time, manual corrections and the availability of required inputs. Record user questions too: an unclear label or missing detail can prevent use even when the calculation is correct.
In our anonymised case study, the operator reports faster use of data and more detailed custom views. We do not claim a measured numerical saving or transfer that outcome to other projects. Establish a baseline for your own work.
Let’s discuss your process
Choose one report you assemble manually today. We can map its sources, total checks and first independently useful phase.
Let’s discuss your process